Pavifort Projects
Home/Projects/FTL- Main Terminal Building Painting and Rehabilitation

FTL- Main Terminal Building Painting and Rehabilitation

CategoryCommercial Infrastructure
LocationSierra Leone
CompletionCompleted
Client / AuthorityBollore-FTL
StatusDelivered
Quality StandardISO 9001 / BS

Employer: Bollore-FTL

Employer: Bollore-FTL

FTL- Main Terminal Building Painting and Rehabilitation

Scope of Work & Key Deliverables

Executed using advanced laser-controlled asphalt machinery, modern geotechnical soil compaction, and certified safety compliance.

LocationSierra Leone
FTL- Main Terminal Building Painting and Rehabilitation gallery photo 1
FTL- Main Terminal Building Painting and Rehabilitation gallery photo 2
FTL- Main Terminal Building Painting and Rehabilitation gallery photo 3
FTL- Main Terminal Building Painting and Rehabilitation gallery photo 4
FTL- Main Terminal Building Painting and Rehabilitation gallery photo 5
FTL- Main Terminal Building Painting and Rehabilitation gallery photo 6
FTL- Main Terminal Building Painting and Rehabilitation gallery photo 7

Engineering & Execution Process

From preliminary geological surveys and drainage design through automated asphalt paving and quality certification, Pavifort adheres to uncompromising safety and durability benchmarks.

Topographic Survey & Geotechnical Testing

Comprehensive soil mechanics analysis, core extraction, hydraulic flow modeling, and multi-agency environmental compliance.

Sub-base Stabilization & Heavy Earthworks

Laser-guided motor grading, aggregate base compaction, reinforced drainage channels, and continuous density monitoring.

Precision Asphalt Paving & Quality Handover

Continuous multi-layer asphaltic concrete surfacing, thermoplastic delineation, safety barrier installation, and SLRA certification.