
The scope of work covers 34 streets in the township. The project was extended by 5Km which covered as additional 6 streets. Employer: Sierra Leone Roads Authority (SLRA) Funded by : Government of Sierra Leone through the Road Maintenance fund Administration (RMFA)
The scope of work covers 34 streets in the township. The project was extended by 5Km which covered as additional 6 streets. Employer: Sierra Leone Roads Authority (SLRA) Funded by : Government of Sierra Leone through the Road Maintenance fund Administration (RMFA)

Scope of Work & Key Deliverables
Executed using advanced laser-controlled asphalt machinery, modern geotechnical soil compaction, and certified safety compliance.







Engineering & Execution Process
From preliminary geological surveys and drainage design through automated asphalt paving and quality certification, Pavifort adheres to uncompromising safety and durability benchmarks.
Topographic Survey & Geotechnical Testing
Comprehensive soil mechanics analysis, core extraction, hydraulic flow modeling, and multi-agency environmental compliance.
Sub-base Stabilization & Heavy Earthworks
Laser-guided motor grading, aggregate base compaction, reinforced drainage channels, and continuous density monitoring.
Precision Asphalt Paving & Quality Handover
Continuous multi-layer asphaltic concrete surfacing, thermoplastic delineation, safety barrier installation, and SLRA certification.

