
REALIZATION ETUDES ET LE' EXECUTION DES TRAVAUX DE CONSTRUCTION ET DE BITUMAGE DES TRANSVERSALES T12, T13, T14 DANS LES PRECTURES DE DUBREKA ET COYAH (GRAND CONAKRY)
Construction of Road Employer: Guinea Roads Authority Funded by: Government of Guinea
Construction of Road Employer: Guinea Roads Authority Funded by: Government of Guinea

Scope of Work & Key Deliverables
Executed using advanced laser-controlled asphalt machinery, modern geotechnical soil compaction, and certified safety compliance.



Engineering & Execution Process
From preliminary geological surveys and drainage design through automated asphalt paving and quality certification, Pavifort adheres to uncompromising safety and durability benchmarks.
Topographic Survey & Geotechnical Testing
Comprehensive soil mechanics analysis, core extraction, hydraulic flow modeling, and multi-agency environmental compliance.
Sub-base Stabilization & Heavy Earthworks
Laser-guided motor grading, aggregate base compaction, reinforced drainage channels, and continuous density monitoring.
Precision Asphalt Paving & Quality Handover
Continuous multi-layer asphaltic concrete surfacing, thermoplastic delineation, safety barrier installation, and SLRA certification.

