The road package are two parts Part 1: the main road at west of the site and parallel to Sewa River and has a length of 17,000m. Part 2: Five settlement roads of total length 15,730m. Employer: Sierra Leone Regional Rice Value Chain Project) Funded by : (BADEA) Arab Bank for...
The road package are two parts Part 1: the main road at west of the site and parallel to Sewa River and has a length of 17,000m. Part 2: Five settlement roads of total length 15,730m. Employer: Sierra Leone Regional Rice Value Chain Project) Funded by : (BADEA) Arab Bank for Economic Development in Africa

Scope of Work & Key Deliverables
Executed using advanced laser-controlled asphalt machinery, modern geotechnical soil compaction, and certified safety compliance.




Engineering & Execution Process
From preliminary geological surveys and drainage design through automated asphalt paving and quality certification, Pavifort adheres to uncompromising safety and durability benchmarks.
Topographic Survey & Geotechnical Testing
Comprehensive soil mechanics analysis, core extraction, hydraulic flow modeling, and multi-agency environmental compliance.
Sub-base Stabilization & Heavy Earthworks
Laser-guided motor grading, aggregate base compaction, reinforced drainage channels, and continuous density monitoring.
Precision Asphalt Paving & Quality Handover
Continuous multi-layer asphaltic concrete surfacing, thermoplastic delineation, safety barrier installation, and SLRA certification.